My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE107785
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE107785
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:00:16 PM
Creation date
11/24/2007 3:49:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1989074
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT C COPIES OF OTHER PERMITS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:" <br />` COLORADO DEPARTMENT OF HEALTH, Gater Quality Control Division <br />Renewal Permit Rationale - Page 2. Permit No.: COG-850000. <br />II. Permit Changes (continued) <br />BMP's also include treatment requirements, operating procedures, and <br />practices co control plant site runoff, spillage or leaks, sludge or <br />waste disposal, or drainage from rav material, intermediate and finished <br />product storage. Pollution prevention (incorporating waste minimization) <br />is an essential pare of best management practices. The permittee must <br />look ac all phases of the operation to determine what changes could be <br />made chat would result in a lover consumption and/ot disposal of <br />pollution-generating materials, as well as minimizing exposure of <br />pollucancs to stormwacer. Such efforts often result in greater profit co <br />the permittee and less pollution of the environment. <br />The mechanism for implementation of stormwacer BMP requirements within <br />this permit shall be the stormwacer Management Plan (SS7MP). <br />The permittee will be required to develop and implement a SWMP plan. <br />Some activities required under this plan may already be in place. <br />However, Che 5~7MP plan will require the permittee to coordinate these <br />activities with any necessary new activities in an orderly manner ;o that <br />the result is the reduction or elimination of pollutants reaching state <br />waters from arees rot limited by effluent limitations. An added benefit <br />may be a reduction of pollution reaching other media, such as the air or <br />hazardous waste disposal sites. In face, the permittee is encouraged ce <br />strive for this overall goal. l7here the reduction of water pollution <br />only results in the increased pollution of other media, there is no net <br />benefit co the environment. <br />The permittees certified under this permit shall be required to submit a <br />SWMP to the Division for review wichir. six months from the date the <br />certification is issued. The requirements of the plan do not specify the <br />exact pollution control facilities that the permittee must construct, <br />Instead, the plan allows foe creativity on the permictee's part, as long <br />as the goal is achieved. Each permittee will need to determine what <br />controls are necessary at the specific site. Then, the permittee will <br />need co develop a plan for the timely execution of these controls, Vhere <br />construction is necessary, the plan shall include a schedule detailing <br />the milestones involved with such construction. As necessary, elements <br />of the plan may require prior approval from the CMLRD. <br />The plan shall include a statement signed by cop management in which they <br />affirm that compliance with [he plan shall occur. Also, it shall provide <br />for updates where there is a change in operation that will or may result <br />in a change in the quality of pollucancs addressed by this plan, or if <br />the plan is shown to be ineffective in achieving the specified goals. <br />The plan, once submitted, will be incorporated into the perraic and its <br />implementation will be considered a permit requirement. Failure co do so <br />could result in enforcement action. The plan shall remain in effect as <br />ling as the facility is regulated by a CDPS permit. The permittee will <br />be expected co certify on a yearly basis chat the plan is being <br />implemented as required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.