Laserfiche WebLink
i <br />3. Describe the mracnreg to be taken for release of a reportable quantity of a hazardous material or <br />the release of a tonic substance. This includes plans for spill prevention, containmen#, <br />notification, and cleanup. <br />There will be no release of toxic materials due to this oderation. <br />Additionally. the mined substances do not~roduce any toxic substances. <br />H. Reclamation Descrbe the anmial and final reclamation standards based on the anticipated <br />schedale for constrnction,.ogerations, and project closure.: Include such items as the removal of <br />stnrctures and facilities .including bridges and culverts, a revegeta#ion plan, permanent <br />containment of mine tailings; waste, or sludges which pose a threat of a release into the <br />environment, closing ponds and eliminating standing water, a final surface shaping plus, and <br />post operations moriiforing and maiates~P plans. <br />YL FOItES?'SERYfCEEY,4LZ7.4T701VDFPlANOFOPERATIDNS <br />A. Required changes/modifications/special mitigation for glen of operations: <br />{. <br />l ; <br />(Ifmore space is needed to frll out a bfvck of information, use addrtianat sheets and attach to f©rrrc) <br />