Laserfiche WebLink
B. Bond. Reclamation of all disturbances connected with this plan of operations is covered by <br />Reclamation Performance Bond Na. _ dated signed by <br />(Principal) and (Surety), for the penal snnr of <br />This Reclamation Performance Bond is a guarantee. of faithful performance <br />with the terms and conditions listed below, and with the reclamation requirements agreed upon <br />in the plan of operations. This Reclaznation Performance Bond also extends to and includes any <br />unauthorized activities conducted in ca~nnection with this operation. <br />The bond amount for this Reclamation. Performance Bond was based on a bond calculation <br />worksheet. The bond amount may be adjusted during the term of this proposed plan of <br />operations in response to changes in the operations or to changes in the economy. Both the <br />' Reclamation Performance Bond and the bond calculation worksheet aze attached to and made <br />part of this plan of operations. <br />Accegtable.bond secuiit=es (subject to change) include: <br />1. Negotiable Treasury bills and notes which aze unconditioaatly guarandeed as to both principle <br />and interest is an amount equal at their par value to the penal sum of the bond; or <br />Z.. Certified or cashier's check, bank draH, Post Office money order; cash, assigned certificate of . <br />deposit, assigned savings account, blanket bond, or an irrevocable letter of credit equal, to the <br />penal sum oftlie bond. <br />_.. .. _. <br />vn. ~rr~rs~vn.eoxnrrroxs :. _. <br />"'A. If a bond is required, it must be famished before approval of the plan. of operations. ~ ~ • <br />B. Information provided with this plan marked confidential will be treated in accordance with the <br />agencs~`s laws; rules,•and regulations. . <br />C. Approval of this plan does not constitute certification of ownership to any person named hereut <br />and(or recognition of the validity of any mining claim aanred herein.. <br />D. Approval of this plan does not relieve me of my responsibility to comply with other applicable <br />state or federal laws, rules, or regulations. <br />E_ If previously undiscovered cuhvral resources (historic or prehistoric objects, artifacts, or sites) <br />are exposed as a result of operations, those operations will not proceed until notification is <br />received from the Authorized Officer that provisions for mitigating nnforseen impacts as <br />required by 36 CFR 228. ;(ej and 3b CF'R 800 have been cor~lied with. <br />F. This plan of operations has been approved for a period of or until <br />A new or revised gLm must be submitted in accordance with 36 GFR Bart 228, subpart A, <br />operations aze to be continued atYer that time period. <br />i'117. O PER ~ T1 T T G PL A N A C C EP TA N CE <br />UWe have reviewed and agreed to comply with aIl conditions in this p}an of operations including the `' <br />required changes, modifications, special mitigation, and rec}arnation requirements. UWe understand.: <br />