Laserfiche WebLink
Joseph Dorris, <br />Jack Plan of Opera <br />~- <br />VI. FOREST SERVICE EVALUATION OF PLAN OF OPERATIONS <br />B. Bond. Reclamation <br />lan of operations is covered by <br />si ed by Jose h Dorris <br />Reclamation of all disturbances connected with this p <br />performance Bond C stal Jack and Access Roads ,dated Julv?1 200 , gn <br />enal sum of $1, 1.1.95..?'~s Reclamation Performance Bond is a <br />(principal) and n!a (Surety), for the p <br />nce with the terms and condrhons listed below, annG rB nd also extends to <br />guarantee of faithful Ped°rma lan of operations. This Reclamation Performs <br />requirements agreed upon in the P <br />and includes any unauthorized activities conducted in connection with this operation. <br />be ad usted during She term of this Proposed plan of operations in <br />The bond amount for this Reclamation Performance Bond was based gothbhe Reclautnation Performance <br />(attached). The b endname ope~ti ~ or to changes itt the economy. ~ of tlvs plan of operations. <br />response to Chang <br />Bond and the bond calculation worksheet are attached to and made p <br />Acceptable bond securities (subject to change) include: <br />bills and notes which are unconditionally guaranteed as to both Prtt'ciple <br />1. Negotiable Treasury ed certificate of <br />and interest in an amount equal at their par value to the penal sum of the on ; or <br />order, cash, assign ua] to the <br />2. Certified or cashiers s account blanket bond, ortan irr eocable lerter of credit eq <br />deposit, assigned saving <br />penal sum of the bond. <br />The bond amount will be reviewed annually and adjusted to compensate for completed reclamation work, <br />changes in equipment rental rates, increased scope of operations, etc. <br />Bond Calculation: lete. <br />Bond calculation not comp <br />azed b the South Pack he d fortthe operahono~An <br />The following is the bond calculation worksheet prep y roved. <br />amount of the bond amount is $17.595, based upon the current amount bemg <br />erating Plan is aPP <br />additional amount of $11,195 will be need ~ before the op slat Jack and Colorado <br />*This bond is jor both the Crystal Jack dt sites and the Glacier Peak, Cry <br />Calumet temporary access roads. $ 100 <br />present bond held with State of Colorado, Division of Minerals & Geology: <br />$ 6,600 <br />Present bond held with the US Forest Service, South Pazk Ranger District: <br />$6,700 <br />Total bond amount Presently being held: <br />