Laserfiche WebLink
POWDERHORN COAL COMPANY <br />• SOUTH LEASES EXPLORATION PLAN <br />1985 <br />TABLE 2 <br />RECLAMATION COSTS <br />ROAD TO PCC-10 LENGTH: 600 ft. <br />ITEM QUANTITY <br />Ripping S Regrading <br />Cat D-7 Dozer with <br />Ripper and Operator <br />Reclamation <br />1 - Cat D-5 Dozer with <br />Tye Range Drill and <br />Operatoz <br />2 - Fertilizer <br />- Seed <br />4 - Mulching - Finn Straw- <br />blower (mechanical <br />crimp covered in <br />item 1 above) <br />Miscellaneous Cost <br />Estimated Contractor <br />Overhead & Profit <br />Overhead @ 158 <br />Profit @ 108 <br />WIDTH: 15 ft. AREA ACRES: 0.20 <br />UNIT UNIT COST TOTAL COST <br />1.0 HRS $150.00 $150.00 <br />1.0 HRS 70.00 $ 70.00 <br />0.2 ACRES 372.00 74.00 <br />0.2 ACRES 84.00 17.00 <br />0.2 ACRES 100.00 20.00 <br />$331.00 <br />$ 50.00 <br />33.00 <br />$414.00 <br />