Laserfiche WebLink
POWDERHORN COAL COMPANY <br />• SOUTH LEASES EXPLORATION PLAN <br />1985 <br />TABLE 2 <br />RECLAMATION COSTS <br />ROAD TO PCC-09 LENGTH: 1,900 ft. <br />ITEDi QUANTITY <br />Ripping b Regrading <br />Cat D-7 Dozer with <br />Ripper and Operator <br />Reclamation <br />1 - Cat D-5 Dozer with <br />Tye Range Drill and <br />Operator <br />2 - Fertilizer <br />- Seed <br />4 - Mulching - Finn Straw- <br />blower (mechanical <br />crimp covered in <br />item 1 above) <br />Mobilization/Demobilization <br />Cat D-7 <br />Cat D-5 <br />Reclamation Equipment <br />1 - Set <br />Miscellaneous Cost <br />Estimated Contractor <br />Overhead & Profit <br />Overhead @ 15~ <br />Profit @ 108 <br />• <br />3.0 <br />WIDTH: 15 ft. AREA ACRES: 0.65 <br />UNIT UNIT COST TOTAL COST <br />HRS $150.00 $ 450.00 <br />1.5 HRS 70.00 $ 105.00 <br />0.65 ACRES 372.00 242.00 <br />0.65 ACRES 84.00 55.00 <br />0.65 ACRES 100.00 65.00 <br />$ 917.00 <br />2.0 HRS 130.OG 260.00 <br />2.0 HRS 130.00 260.00 <br />2.0 HRS 130.00 120.OJ <br />$ 640.00 <br />$ 234.00 <br />156.00 <br />$1,947.00 <br />