My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE107600
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE107600
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:00:06 PM
Creation date
11/24/2007 3:34:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Permit File
Doc Date
5/13/2002
Section_Exhibit Name
Tab 02 Exploration Plan
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The permanent seed mix can be found in Table 1. <br />• Roads <br />All temporary (4) roads, including existing access to PCC-O1 <br />and PCC-OS shall be obliterated and each road shall be ripped, <br />seeded, mulched, fertilized and permanently reclaimed to a <br />point where existing access is provided. No other existing <br />access roads shall be reclaimed by Powderhorn Coal Company. <br />All reclamation shall be done in the fall. <br />The long term road from existing access to PCC-03 shall be <br />reclaimed when access shall no longer be required for vent- <br />ilation structures anticipated in the area. Powderhorn Coal <br />Company controls the access on the existing road. <br />• <br />2.02.2 (5) Bonding and Reclamation Costs <br />Powderhorn Coal Company <br />sites (8) and temporary <br />ing plan. Although the <br />horn Coal Company shall <br />reclamation costs shown <br />be $13,000.00. Powderh~ <br />amount required for the <br />from the portion of the <br />Cameo No. 1 Mines which <br />required to reclaim the <br />bond amount is shown on <br />shall permanently reclaim all drill <br />roads (4) within one year of the drill- <br />disturbance shall be short-term, Powder- <br />provide a bonding amount based on the <br />on Table 2. The bond amount shall <br />ern Coal Company requests that the bond <br />subject technical revision be taken <br />reclamation bond for the Roadside and <br />is in excess (over bonded) of the amount <br />mining operation. A balance of the <br />Table 3. <br />• <br />} <br />
The URL can be used to link to this page
Your browser does not support the video tag.