Laserfiche WebLink
<br />The sequence of mining is as follows: <br />1. A connecting haul road will be constructed to join the <br />existing road to the plant site. <br />2. Two acres of stockpiled gravel will be moved to create a plant <br />site. Some gravel may be hauled off-site to an existing <br />processing plant that is already permitted by the operator. <br />3. Gravel will be moved to the plant site for processing. <br />4. Processed material will be stockpiled and hauled off the site. <br />Drinking water for the employees will be bottled water. A portable <br />sanitary facility such as a San-O-Let will be on site as well as a <br />small trailer. <br />All structures and equipment will be removed from the site after <br />mining and reclamation is completed. <br />D-3 <br />