Laserfiche WebLink
The normal process of backfilling the pit will result in the <br />plugging of-the bore holes. Significant airounts of ground water do <br />not exist within the affected area to warrant separate sealing activities <br />for the holes. However, if future augering encounters ground water, then <br />the holes will be sealed by cronq~acting shale into and around the holes. <br /> <br /> <br />VI-4 <br />