Laserfiche WebLink
EXHIBIT D <br />RECLAL~iTION PLAN <br />The area will be reclaimed over a 5 year period beginning in the <br />fall of the first year of pit operations. <br />The pit will be graded so that no slope exceeds 3:1. Then <br />stockpiled topsoil will be spread over the area and seed and <br />mulched according to recommendations of the Soil Conservation <br />Service. <br />It is anticipated that reclamation costs will be approximately <br />$8,500. <br />RECEIVE® <br />FEB 14 2U02 <br />Division at Minerals and Geolo9Y <br />