My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-12-11_PERMIT FILE - C1981019 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2001-12-11_PERMIT FILE - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 5:19:58 PM
Creation date
11/24/2007 2:56:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 07 Item 04 DRAINAGE PLAN FOR COLOWYO COAL CO WORK AREA TIPTON AND KALMBACH INC 1979
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Working Area, Haul Road and Loadout Area Ditches <br />These ditches consist of the collection ditches in the working area, the ditches • <br />along the haul road, and the ditches in the loading area. Details of these ditches are <br />given in Table 2, and the cross sections are portrayed on Figure 4. <br />The working area ditches collect the drainage from the entire working urea, ';the <br />are~5 occupied by the mine office, maintenance buildings and yards, and warehouses, <br />and direct this drainage to the working area sedimentation pond. <br />The haul area ditches collect the drainage intercepted by the haul roads and <br />oricinating on the haul roads and take the drainage to road culverts for passing under the <br />haul road into natural drainages. <br />The loadout area ditches consist of a ditch to divert water from undisturbed area <br />away from the loadout area and ditches within the loadout area to collect the drainage and <br />direct it to the loadout area sedimentation pond. <br />All these ditches have been designed to contain flow from a 10-year precipitation <br />event in accordance with the Board regulations for permanent ditches draining areas less • <br />thar~ one square mile. The working area and loadout area ditches will be maintained for <br />the duration of the mining activity, and then will be removed restoring the ground to. its <br />original contour and drainage patterns. The haul road ditches will likewise be removed <br />along with the haul road restoring the ground to its original contour if there is no need for <br />the haul road following the mining activity. However, if there remains a need for the <br />haul road for other activity following the end of mining, the haul road ditches would be <br />left in place. <br />ROAD CULVERTS <br />Some 25 culverts have been installed under the roads on the mining property. <br />Nineteen of these culverts are under the haul road, four culverts are under roads in the <br />loadout area, and two culverts are under railroad tracks in the Gossord loadout loop. <br />Details of these 25 culverts are given in Tables 3 thru 6, and typical sections are shown <br />on Figure 5. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.