My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE107193
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE107193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:59:45 PM
Creation date
11/24/2007 2:51:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
10/14/2007
Section_Exhibit Name
2.05.5 Postmining Land Uses
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The first permit renewal was granted in May of 1988 and the second was granted June 3, 1993. During the period <br />of 1993 through November 1999, the Division has approved permit revisions 2 (see Mining District), 3, and 4 <br />(Eastem Mining District). <br />The mining activities envisioned by the first permit, issued in 1983, was strictly for room and pillar mining. The <br />approval by Twentymile Management for a longwall resulted in a change in mining method in 1989. Prior to that <br />time development work was commenced which saw the development of the North Mains and subsequent gateroad <br />development for the west side of the mine (panels 1 through 6). These panels were all mined up dip. The mining <br />of these panels was completed in 1994. <br />The next district, which TCC mined was known as the Southwest Mining District, and longwall coal was produced <br />form this district from 1994 into 1996. Panels 1" SW to 3rd SW were mined from this district. <br />In 1996, TCC began longwalling coal from the Eastem Mining District. The name reflects the fact that this district <br />is located to the east of the North Mains. The Eastern Mining District is comprised of longwall panels 9 Right <br />through 2 Right. It is anticipated that mining of the 2 Right panel will be completed in 2000. Upon completion of <br />mining in the Eastern Mining District, TCC plans to move into the Northern Mining District. The Northern Mining <br />District is the subject of permit revision 5, which is pending regulatory approval. <br />A survey of the area overlying the planned mining has identified the following structures, resource features, and <br />facilities that could be affected by potential subsidence. <br />U <br /> <br />AI~a~~iQN~~- APR 2 4 2000 <br />Permit Renewal No. 3 2.05-172.1 11/1/99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.