Laserfiche WebLink
(5) Surface Minine Near Underoround Minine. For surface minine activities within the proposed permit <br />area to be conducted within 500 feet of an underground mine, the application shall describe the measures to he used <br />to comply with 4.19. <br />RESPONSE <br />Mining within the proposed permit area will be underground mining. No surface mining activities are proposed <br />within 500 feet of the underground mine. <br />O~J ' l~ (6) Subsidence Survey, Subsidence Moni[orine, and Subsidence Control Plan <br />(a) For underground mining activities the application shall include an inventory of all <br />structures and renewable resource lands which exist within the proposedpermi[ and adiacent area. <br />(i) If no such structures or renewable resource lands exist, no further information need <br />be provided in the application under this Section. <br />include: <br />(ii) If such structures or renewable resource lands exist, then die application shall <br />(A) A brief description of all stnstures and renewable resource lands which <br />exist within the ~onosed Hermit and adiacent area; and <br />(B) An appropriate mau, prepared according [o Section 2.10. showim~ the <br />location and configuration of structures and renewable resource lands within the pennii and adiacent area. <br />• (b) If sh'ttchtres and renewable resource lands are determined to exist within the proposed <br />permit and adiacent area, the application shall include a description of the worst possible consequences which <br />subsidence, if it occurred, could have for such structures and renewable resource lands. <br />(i) The application shall iucludc a determination of whether subsidence. if it occurred, <br />could cause material damage or diminution of reasonably foreseeable use of such structures and renewable resource <br />lands. This description of worst passible subsidence consequence shall include: <br />(A) A brief description of pre- and post-minine land uses of the-permit and <br />adiacent area, as described pursuant to Sections 2.04.3 and 2.05.5. <br />(B) A brief description of subsidence related phenomena predicted to occur <br />within the permit and adiacent area: and <br />(C) A brief description of material subsidence damage or diminution of <br />reasonably foreseeable use of structures and renewable resource lands which could result from the occurrence of <br />the subsidence related phenomena described in acca'dance with Section 2.05.6(b)(i)(B), including consideration of <br />the definitions and considerations contained in Section 2.05.6(6)(e)(ii)(A), (B), and (C). <br />RESPONSE <br />Western Minine District <br />• Backeround <br />Mining was begun at TCC's Foidel Creek Mine in 1983. The mining which occurred for the period of 1983 until <br />1989 was strictly room and pillar. The only pillared azea is the I° Panel South. In 1989, the mine installed a <br />longwall and this has been the primary mining method utilized by TCC. <br />Permit Renewal No. 3 <br />APPROVED APR 2 4 2000 <br />z.os-t72 A ~ o -- ae <br />