Laserfiche WebLink
• <br /> <br />-~- <br />PROPOSED BOND REQUIREMENT FOR EIGHT (8) SITES <br />• <br />5ealin Plu i~ <br />Abandonment Fluid Seal <br />lOt/9a1., 1 qal./ft. (.10 x 10,750) $ 1,015 <br />fluid Equipment 520/hr. x 2 hrs. x 8 holes 320 <br />Labor @ 510/hr. x 4 hrs. x 8 holes 320 <br />Rig Time S70/ran x 2 hrs. x 8 holes 1,120 <br />kater Truck @ 2 hrs./hole x 525/hr. x 8 holes 400 <br />8 non-slip pugs @ $1.00 each 8 <br />7 ft. grout @ S5/f t. x 8 hates 280 <br />Labor @ $10/hr. x 2 man hrs./hole x 8 holes 160 <br />F.egrading_and Topsoil Distribution <br />1 hrs./site, S50/hr. x 8 sites 300 <br />Reseeding <br />50 x 50 ft. area x 8 sites 500 <br />Road Repair (Repair of inadvertent damage to existing roads) <br />0.5 miles x 18 hrs./mile x $75/hr. 675 <br />S 5,658 <br />