My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE107087
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE107087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:59:39 PM
Creation date
11/24/2007 2:42:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977297
IBM Index Class Name
Permit File
Doc Date
2/12/1997
Doc Name
1996 RECLAMATION ACTIVITIES AT UMETCO MINE SITES AND SCHEDULED RECLAMATION ACTIVITIES FOR 1997
From
UMETCO MINERALS CORP
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Appendix A <br /> <br />Reclamation activities at Umetco mine sites during 1996 <br />• Burros <br />DMG Permit M/77/297 <br />Stormwater Permit COR-040170 <br />In December, at Umetco's request, San Miguel Power Company removed a power line at this <br />site. The power line was 3 phase, 7 spans, and 8 poles, in disrepair and hazardous. <br />• Deremo-Snyder <br />DMG Permit M/77l288 <br />Stormwater Permit COR-040112 <br />Reclamation activity at this mine site started in March. All of the ventilation raises were <br />closed. Access roads to the ventilation raises were also reclaimed. <br />• Eagle Basin <br />DMG Permit M/79/290 <br />Stormwater Permit COR-040136 <br />One large unlined ventilation raise was filled at this site during the month of December. The <br />cement pad and fan shroud aze still on the collaz. <br />• Eula Belle Mine <br />DMG Permit M/77/291 <br />Stormwater Permit COR-040103 <br />A Technical Revision application was submitted to the DMG in May and appro~ ed. A <br />livestock pond was constructed at the site during April and May, and the portal area was <br />secured with fencing. All the known ventilation raises were closed except EB 1. This lined <br />ventilation raise was transferred to Weimer Ranches and the BLM. In addition, 2 cement <br />collazs for undrilled ventilation raises were removed. <br />At the Martha Belle Mine, apre-law site, Umetco voluntarily closed all known mine <br />openings (3 ventilation raises and 1 portal). <br />• Julian Mines <br />DMG Permit M/79/201HR <br />Stormwater Permit COR-040136 <br />Reclamation activity commenced at this permitted azea in June. Reclamation co~isisted of the <br />closing of access roads, 1 ventilation raise, 12 portals, small cuts and pits, contouring of <br />waste dumps, and seeding. Some pre-law disturbances were also voluntaril}~ closed. All <br />known physical hazazds at the site have been remediated, and reclamation construction <br />activity in this area is complete. <br />The Fairy Queen mine site was seeded. <br />
The URL can be used to link to this page
Your browser does not support the video tag.