Laserfiche WebLink
<br />i <br />1 <br /> <br />' Reclamation Costs <br />The mining disturbance at any one time is estimated based on the <br />' proposed development schedule and mining plan for any quarter to be as <br />follows: <br />' Moderate disturbance: <br />mining unit and stockpile 20 acres <br />1 ~\I \,l , <br />dams and diversion 3 acres <br />' Minor disturbance <br />roads, plant and scale site 10 acres <br />1 <br />The access road is to be left in place after the operation at the <br />' request of the owner, leaving conservatively 3 acres of minor disturbance <br />to be reclaimed. Of the remaining acreage we will assume enough growth <br />' medium might be available to seed the entirety. <br />Soil to be placed and graded in any one quarter is about 50,000 cubic <br />' yards. Soil replacement cost should be twenty cents per cubic yard for <br />the short haul distances in this mining plan for a cost of about $385.00 <br />' per acre. <br />' The proposed seed mixture will cost $22.00 per acre. <br />Based on the mining plan and development schedule, we would recommend <br />1 a floating bond of $10,582.00. <br />1 <br /> <br />1 <br />