Laserfiche WebLink
;.: <br />i <br />c:~, <br />'. i <br />~eK^tnLion Dcoc~Lion -Route County, Stetson 1• <br />1:r LirerLed ground ^_o~~er - c2j percent. <br />lir,LirtiaLcd anuua]. production - 650 lbs~acre (air dry weight baei^,) <br />F.. Ancociatcd. Soil -•• Tl~e pit si.i:e occurs on capping unit X3F. <br />TLfrv soil is a complex; consisting of three soils. The pre- <br />~iominonL soil at tyre site is the Qi>,.nder soil series. The <br />surtr+cc is stony loam about 4 inches thick and the subsoil i.s <br />nanny sandy clay loam and losm about 12 inches thick. The under- <br />].yin,; m.,aterial i3 extremely stony snndy loan to GO inches. <br />79~ta coil is rr_ted as Hoer as a s°;a•ce of topsoil. Soil h}: i., <br />ti.C to 7., and conductivity is ne~',lil;ible, less than 2 mmlios~ <br />crr nt 25° C. S]ope is 2`i to 65 percent. <br /> <br />I <br />r <br />2 <br />