My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE106844
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE106844
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:59:27 PM
Creation date
11/24/2007 2:19:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981034
IBM Index Class Name
Permit File
Doc Date
7/1/1998
Doc Name
pg 157 to 165
Section_Exhibit Name
SECTION 2.06 Special Categories of Mining
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.06.8(3)(c)(iii) <br />(iii) Grand N.esa Coal Company requests a negative determination <br />for the presence of alluvial valley floor within or adjacent to <br />the area of the P,ed Canyon @1 Ftine and proposed q2 t•fine. <br />Section 2.06.9 Auyering <br />P:ot Applicable. <br />Section 2.06.10 Coal Processing Plants and Support °acilities not <br />Located with the Permit <1rea. <br />(1) Scope. 2.06.10 applies to any person who cond~.~cts or intends <br />to conduct surface coal mining anc', reclamation operations utilizing <br />coal processing plants or support facilities as :~.escrihed in 4.04 <br />not within a permit area of a specific mine. Any person who operates <br />such a processing plant or support facility shall have obtained a <br />permit from the Division or 3oard under the regulatory program in <br />accordance with the requirement of 2.06.10. <br />(2) Any application for a permit for operations covered by 2.06.10 <br />shall contain the mining and reclamation plan, specific plans, <br />including descriptions, maps, prepared to the standards of 2.7.0, <br />and cross-sections of the construction, operation, maintenance, <br />and removal of the processing plants and associated support facilities. <br />Refer to Section 2.05.3(7) for details on the Delta Loadout facility. <br />(3) No permit shall be issued for any operation coverer? by 2.06.10, <br />unless the Division or Board finds, in writing, that, in addition <br />to meeting all other applicable requirements of these Rules, the <br />operations will be conducted in compliance with the requirements of 4.2R <br />Section 2.06.11 In Situ Processing t,ctivities <br />Plot .loplicable. <br /> <br />165 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.