• The general sequencing for field activities required t0 <br />backfill a final pit are listed below: <br />I <br />1. Topsoil in areas to be ripped or blasted shall be removed <br />prior to any lard disturbing activities in those areas. <br />2. When necessary, the material in the final highwall is <br />ripped, ar drilled and shot prior to being pushed with <br />dozers into the final pit. <br />3. Spoil material within the mined area is roue graded with <br />dozers into the final pit area and blended into the <br />reduced highwall if present. <br />4. After roue grading, scrapers help move the material to <br />the final pit area. <br />• 5. Dozers then dress up all graded slopes and disturbed <br />areas blending the material into the existing topography, <br />prior to topsoil replacement. <br />4.14.2 GFNII2AL GRADING RDQUIRII+IfSPIS <br />4.14.2(1) Final Graded Slopes. The final graded slopes will not be <br />uniform, but will approximate the preminir,g slopes as shown by <br />FSdiibit 12-9, Pbstinining Contour Map. <br />4.14.2(2) Terraces. Terracing in the final reclamation is not proposed <br />except as required by 4.03.1(7)(a)(vii). <br />4.14.2(3) Small Depressions. Small depressions are not proposed in the <br />posbninir~ topography except where they were pre-existing or <br />where stock tanks are proposed (see Tab 13, P,ppendix 13-9 for <br />design information). <br />• 12-57 Revised 12/10/92 <br />