Laserfiche WebLink
r. <br />r~'"i~,.li L1Y,.IJn CU. TEL <br />P~In .719-:=-~6-w2-, <br />Exhibit U -Reclamation Plan <br />r 25,•.+1 15~i:~u t•Iu.GUl F.u` <br />All reClan~ation is to take place cuncurrcntly with mining operations <br />enp will be completed within 60 days after complctiui~, of the uperation. All <br />processing equipment and structures will be removed from the property of*.cr <br />cui~!pleLiu,i of the operation. <br />The non-saleable waste material from phase one o-:ill be planed into the <br />twu existing intermediate benches in a rip rap conf]gUration and sloped as to <br />insure no material scuffing into the South Fork of the Platte River. The <br />non-saleable waste material from phase two will 6e placed in the excavated <br />area of phase one. t•lhen all mining is cnmpleted the entire pit will be rounded <br />and sloped to a maximum y>•aUie,iL of 3: 1. <br />The c~istiny roads will be left. after mining. All pond areas will Bc fi])ed <br />entl or graded to the cGrrect slope grad~.ents of a maximum 3:1 Slope. <br />AS no Lop s.:il or veyet.at.ion exLSts curre~,t.l.y un the property, np re-soiling <br />or re-vegetation is required. Tne physical characteristics of the surface <br />are ,gut cu~idusrve to plant growth. <br /> <br />