Laserfiche WebLink
Site: <br />Page 46 of 136 <br />MOTOR GRADER WORK <br />Task description: Finish Grade Portal No. 5 Area <br />Williams Fork Mines Permit Action: Permit Renewal 06 <br />PROJECT IDENTIFICATION <br />Task #: 025 State: Colorado <br />Date: 9/6/2013 County: Moffat <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Permit/Job#: C1981044 <br />Abbreviation: None <br />Filename: C044 -025 <br />Basic Machine: CAT 14M <br />1.50 <br />Horsepower: 259 <br />Ripper Attachment: Multi -Shank Ripper <br />Finish <br />Shift Basis: 1 per day <br />Selected Blade Angle: <br />30 <br />Data Source: (CRG) <br />Cost Breakdown: <br />12.10 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />Utilization % <br />Ownership Cost/Hour: <br />$41.37 <br />NA <br />Operating Cost/Hour: <br />$67.74 <br />100 <br />Ripper Operating Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$27.55 <br />NA <br />Total Unit Cost/Hour: <br />$136.65 <br />Total Fleet Cost/Hour: $139.95 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />Source of estimated acreage: <br />HOURLY PRODUCTION <br />20.70 <br />Exhibit 23. page 3 <br />acres <br />Average Grader Speed: <br />1.50 <br />mph <br />Selected Application: <br />Finish <br />grading (0 -2.5 mph) - 1.5 <br />Selected Blade Angle: <br />30 <br />degrees <br />Effective Blade Length: <br />12.10 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />10.10 <br />feet <br />Unadjusted Hourly Unit Production: <br />1.8364 <br />acres/hour <br />Job Condition Correction Factors <br />Site Altitude: 5400 feet <br />Source <br />Altitude Adj: 1.00 <br />CAT HB) <br />Job Efficiency: 0.85 <br />(lsh/d, mod.) <br />Net Correction: 0.8500 multiplier <br />Adjusted Hourly Unit Production: <br />1.5609 <br />acres/Hour <br />Adjusted Hourly Fleet Production: <br />1.5609 <br />acres/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Unit cost: $87.55 per acre <br />Total job time: 13.26 Hours <br />Total job cost: $1,812.00 <br />CIRCES Cost Estimating Software <br />