Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />Page 45 of 136 <br />1.00 Minutes <br />0.60 Minutes <br />Net Correction: 0.830 I NA <br />Site Altitude: 5400 feet <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered. maintained 3.0 <br />Haul Route- <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad': <br />1.000 <br />NA <br />CAT HB <br />Job Efficiency: <br />0.830 <br />NA <br />CAT HB <br />Net Correction: 0.830 I NA <br />Site Altitude: 5400 feet <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered. maintained 3.0 <br />Haul Route- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />2460.00 <br />7.50 <br />3.00 <br />10.50 <br />922 <br />2.70 <br />2 <br />940.00 <br />6.00 <br />3.00 <br />9.00 <br />1042 <br />0.91 <br />Haul Time: 3.61 minutes <br />RAfilm Rnnta• <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />940.00 <br />-6.00 <br />3.00 <br />-3.00 <br />2972 <br />0.39 <br />2 <br />2460.00 <br />-7.50 <br />3.00 <br />-4.50 <br />2972 <br />0.87 <br />Return Time: <br />1.26 <br />minutes <br />Total Scraper team cycle time: <br />6.47 <br />minutes <br />Adjusted for job conditions: <br />446.43 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />446.43 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />446.43 <br />LCY/Hour <br />Unadjusted unit production/hour: 537.87 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: <br />2.80 Hours <br />Unit cost: $1.639 /LCY Total job cost: $2,047.99 <br />CIRCES Cost Estimating Software <br />