Laserfiche WebLink
Page 40 of 136 <br />BULLDOZER RIPPING WORK <br />Task description: Rip Rock Crusher Area <br />Site: Williams Fork Mines Permit Action: Permit Renewal 06 <br />Seismic: <br />Area: <br />Permit/Job#: C1981044 <br />PROJECT IDENTIFICATION <br />Task #: 022 State: Colorado Abbreviation: None <br />Date: 9/6/2013 County: Moffat Filename: C044 -022 <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D10T - 10SU <br />Ripper Attachment: 1 -Shank Ripper <br />Cost Breakdown: <br />Horsepower: 574 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Total Fleet Cost/Hour: $1,37235 <br />MATERIAL QUANTITIES <br />Alternate Methods: <br />NA Bank Volume: NA BCY NA <br />3.67 acres Rip Depth (ft): 1.50 Volume: 8,881 BCY or CCY <br />Source of estimated quantity: Page 2.05.4 -22R <br />Selected estimating method: Area <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />NA <br />feet/second <br />Utilization % <br />Ownership Cost/Hour: <br />$110.68 <br />Average Ripping Depth: <br />NA <br />Operating Cost/Hour: <br />$183.36 <br />6.74 <br />100 <br />Ripper Operating Cost/Hour: <br />$11.64 <br />feet <br />100 <br />Operator Cost/Hour: <br />$37.41 <br />Average Maneuver Time: <br />NA <br />Total Unit Cost/Hour: <br />$343.09 <br />0.736 <br />Total Fleet Cost/Hour: $1,37235 <br />MATERIAL QUANTITIES <br />Alternate Methods: <br />NA Bank Volume: NA BCY NA <br />3.67 acres Rip Depth (ft): 1.50 Volume: 8,881 BCY or CCY <br />Source of estimated quantity: Page 2.05.4 -22R <br />Selected estimating method: Area <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />4.49 <br />mph <br />Average Ripping Width: <br />6.74 <br />degrees <br />Average Ripping Length: <br />200.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.736 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.736 <br />Acres/hr <br />Site Altitude: <br />5,400 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourl U 't P d ti <br />0 61 <br />A /hr <br />J y m ro uc on. <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 4 Grader(s) <br />cres <br />2.44 Acres/hr <br />Total job time: 1.50 Hours <br />CIRCES Cost Estimating Software <br />