Laserfiche WebLink
Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Page 39 of 136 <br />Source <br />0.750 <br />AVG. <br />0.800 <br />CAT HB <br />1.000 <br />GEN. <br />1.000 <br />AVG. <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -OC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.780 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3884 <br />Adjusted unit production: 817.70 LCY/hr <br />Adjusted fleet production: 3270.8 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.405/LCY <br />Total job time: <br />Total job cost: <br />1.14 Hours <br />$1,513.96 <br />CIRCES Cost Estimating Software <br />