Laserfiche WebLink
Page 19 of 136 <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.750 <br />AVG. <br />0.900 <br />CAT HB <br />1.000 <br />GEN. <br />1.000 <br />AVG. <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />0.903 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3209 <br />Adjusted unit production: 303.57 LCY/hr <br />Adjusted fleet production: 1214.28 LCY/hr <br />JOB TIMIE AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $1.098/LCY <br />Total job time: <br />Total job cost: <br />278.23 Hours <br />$370,820.34 <br />CIRCES Cost Estimating Software <br />