Laserfiche WebLink
Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Page 17 of 136 <br />1.000 <br />GEN. <br />1.000 <br />AVG. <br />0.830 <br />(1 SH FT/DAY) <br />0.800 <br />(FND -RF) <br />0.903 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3513 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />238.88 LCY/hr <br />955.52 LCY/hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $1.395/LCY <br />Total job time: 60.93 Hours <br />Total job cost: $81,204.77 <br />CIRCES Cost Estimating Software <br />