Laserfiche WebLink
6.4.5 Exhibit E -Reclamation Plan <br />• Table 1 -Reclamation Sequence Summary <br />Reclamation Activity Mining Sequence <br />Stockpile any remaining waste material <br />from Area A in Area D (existing stockpile <br />from work performed under 111 Permit) <br />• <br />• <br />Backfill east side slope in Area A of the <br />West Pit to finished grade. Begin to fill the <br />wide flat-topped berm creating the north <br />side of the South Reservoir. <br />Backfill the side slopes of the north pond <br />created by excavation of Area B. <br />Backfill Area C of the West Pit to final <br />grade. Relocate the Encana gasline that <br />currently runs east/west through the center <br />of the West Pit in Area. <br />During mining of Area A, (area where the <br />Encana Nelson 12-32 and the Texas Tea <br />Nelson 1A gas wells reside and area of <br />111 Permit work). <br />During mining of gravel deposits in Area B <br />at far north end of the West Pit. <br />During mining operations in Area C of the <br />West Pit. <br />During mining operations in the south <br />portion of Area D in the West Pit. <br />Backfill the western edge of the West Pit in During mining of a 500' strip on the west <br />Area D. Bring the South Reservoir berm up edge of the West Pit in Area E. <br />to grade and tie in with the reservoir berm <br />constructed in Area A. <br />Backfill the northwest corner of the West Pit During mining of a 500' strip on the <br />in Area E as well as the west slopes of the southwest corner of the West Pit in Area <br />South Reservoir in this area. <br />Backfill the south and west slopes of the <br />South Reservoir in Area F of the West Pit. <br />F. <br />During mining of a 500' strip on the south <br />edge of the West Pit in Area G. <br />Backfill the south slope and southeast During mining of a 400' strip on the east <br />corner of the South Reservoir berm in Area edge of the West Pit in Area H. <br />G. <br />Backfill the east edge of Area H bringing the During mining of the 400' strip on the east <br />east berm of the South Reservoir to final edge of the West Pit in Area I. <br />grade. <br />Bring all berms surrounding the West Pit During mining of the center portion of the <br />excavation up to final grade (4955). West Pit in Area J. <br />Continue to bring all South Reservoir berms During mining of the center portion of the <br />to final grade as necessary. West Pit in Area K. <br />Line interior slopes and bottom of South <br />Reservoir with clay, top soil, seed, and <br />fertilize exterior side slopes. <br />During initiation of mining activity in the <br />East Pit. (See description on following <br />page). <br />File Pit 112 DMG Permit Application <br />Page 7 of 27 <br />