Laserfiche WebLink
6.4.5 Exhibit E -Reclamation Plan <br />• stripped from this pit will initially be stockpiled as necessary (never to exceed <br />100,000 yd3) or will be used to construct the berms for the South Reservoir. <br />The general order of reclamation activities are provided in Table 1, Reclamation <br />Sequence Summary on the following page. <br />• <br />• <br />File Pit 112 DMG Permit Application <br />Page 6 of 27 <br />