Laserfiche WebLink
~ • <br />TABLE 5-1 <br />OPERATIONS TIMETABLE <br />WITH TOPSOIL REDISTRIBUTION <br />SCHEDULE <br /> Location <br /> Coal OB Time Topsoil <br />Activity Phase Section Seoment(sl Lifts Location Length Redistribution <br />OB end Coal Removal [ 1 &. 2 Wzst A-1 Ihm C-1 1,2,7 Fill 24/MonNs - <br />OB end Coal Rcmovel 1 1 D-1, E-1 1,2,3 B-1 12/Monlhs Fill <br />OB end Coel Removal II 3 F-I, G-I 1- 3 B-1/C-1 12/Momhe B-1 <br /> D-I/E-1 <br />08 and Coel Removal II 2& 3 H-I /[-2 1- 3 F-1/G-1 12/Months C-1, 0.I <br />OB and Coal Removal II 2 I-2 Fsst 1 G-I 12/Moniha E-2 <br />Topsoil Disvibution - - -- 12/Months F-I, G-1 <br />