Laserfiche WebLink
,~ ~ iiiiuiiiiiiiiiiiii <br />PIONEER <br />~ ENGINEERING <br />P E N COR CORPORATION <br />October 25, 1990 :° <br />Mr. Harry B. Ranney <br />Mined Land Reclamation Division <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />!1 ~~ _. <br />'J v ! ... <br /> <br />Re: Pueblo Coal Inc. <br />Carbon Junction Mine <br />Dear Harry: <br />In response to your letter of October 9, 1990, transmitted herewith is <br />information that hopefully fully responds to the major issues for permit <br />issuance. <br />Pueblo Coal Inc. plans for a full reintegration of the recently submitted <br />data plus other forth coming revisions discussed in the above referenced letter <br />into the body of the permit prior to the beginning of mining. <br />More specific to Items 16, 25 and 28 in the above letter, I have enclosed <br />a topsoil redistribution schedule and two certified topo maps indicating the <br />permit boundaries and pit disturbance. The final topography has also been <br />indicated on these maps. We hope to have a fully completed topo of the entire <br />permit area for the formalized permit. <br />To date these has been no construction of the surface facilities or <br />ancillary support facilities, i.e. plants. The pit activities continue to be <br />in Phase I in Section 1 and 2 West. Overburden has been moved from the East Pit <br />to the overburden fill. <br />As soon as you have had the opportunity to look over this material, I would <br />like to meet with you and discuss the stream channel design criteria referenced <br />in your October 9th letter. <br />Meanwhile, should you have any questions, please fee free to call. <br />Sincerely, <br />DAF/dsb <br />PIONEER ENGIN/EE,R~I NAG CORPORATION <br />~(iL G/( 7 r ~_ <br />Darry A ~erguson <br />Presiden <br />DRILLING DEVELOPivfENT OPERATIONS ENGINEERING <br />