removal of the sand far the ditch route change, the removal of the dike <br />• and connection of the pits, and the lowering of the west side is shout <br />44% of what needs to 6e done to complete this operation. After these <br />steps are completed the next step will 6e to institute full reclamation <br />of the pit. For information on the reclamation process see the <br />Reclamation Flan. <br />TIMETABLE: <br />The estimated time scale for this process is shown in the attached <br />diagram. In essence, the time scale is on the order of 4 to 5 years. <br />• <br />• <br />F'AGE 5 OF 5 - EXHIBIT D <br />