ALTERATION OF THE DITCH RDllTE: <br />---------- -- --- ----- ------ <br />• The first step in the process of altering the ditch route is to <br /> create a route for the ditch on the north side of the pit. The ditch <br />will make a sharp easterly turn where the entrance road enters the pit. <br />It will then head east along a carefully engineered route to a point <br />just west of Rcademy Boulevard. At that point it will be about 24 feet <br />lower than the level of Academy. From there it will be routed through a <br />piped bore under Academy. Dn the other side of Academy it will head <br />east a short distance and then south along Academy to rejoin the <br />e>:isting ditch route (unless Daniel's Sand decides to alter the ditch <br />route on the east side of Academy). <br />In order to accomplish this task of routing the ditch across the <br />north side of the pit, a large amount of fill must first be placed <br />against the existing slope below the access road so the access can <br />• remain in essentially the same location until the dike is removed, at <br />which time the access can be from the south. <br />The fill, much of which has already been hauled into the site as <br />backfill to produce slopes under the existing plan, will be pushed up <br />against the north bank below the roadway. This will allow the roadway <br />to be moved slightly south so excavation of the new ditch route can 6e <br />accomplished. <br />After the roadway is shifted the new ditch route will be excavated <br />across the north side of the pit. From that excavation about 70,000 <br />cubic yards of sand will be acquired. When the ditch rerouting is <br />complete then the next step in the process can be instituted. <br />\J <br />F'AGE 2 OF v - EXHI$IT D <br />