Laserfiche WebLink
~ i <br />-3- <br />determined: <br />b) The Board will enter the lands to perform reclamation only if the Board has <br />not been performed, and <br />i. that reclamation required by law to have bees performed upon such lands has <br />ii. that pemtit revocation proceedings described in the Act or similar provisions <br />of subsequent laws, if any, have been imitiated. <br />c) The Division, ailing for the Board, will errter lands to respond to an emergency oily <br />where the Division determines that any ofthe conditions of Construction Material Rule 8.4.2 exist. <br />~ The additional conditions sei forth in the attached rider, if any, are incorporated herein by <br />reference. <br />// a) Rider is attached. <br />/ JOC / b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />MICHAEL B. L <br />Division Director <br />