My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE106455
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE106455
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:59:10 PM
Creation date
11/24/2007 1:48:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005080
IBM Index Class Name
Permit File
Doc Date
8/27/2007
Doc Name
Cost Summary form
From
Allen Drilling and Excavating Co., Inc.
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimeting Software <br />PROJECT IDENTIFICATION <br />sheet 1 of 2 <br />Agency or organization name :Colorado Division Of Reclamation Mining And Satety <br />Task # : 003 State :Colorado Permitfjob # :M-2005-080 <br />Date : 09/29/2006 County :Park Abbreviation :none <br />User : KAP Site :Allen Pit Filename :M080-003 <br />Permit or otherjob action :Surety Reduction <br />Task description :Grade Overburden and Topsoil <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Bre <br />Scraper work team -Scraper :Cat 627G w/push-pull <br />-Push dozer:~NA <br />Support equipment -Load area :Cat D8R Series II - 8SU <br />-uump area <br />Road maintenance-Motor grader:INA <br />-W ater truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Watertruck <br />Import data filename : scraper2 NA dozer NA NA NA <br />Utilization-machine : 100 NA 100 NA NA NA <br />-Ripper attachment: NA NA 30 NA NA NA <br />Ownerhip cost/hour : $60.47 NA $51.18 NA NA NA <br />Operating cosUhour : $119.18 NA $73.75 NA NA NA <br />Ripper op.cosUhour: NA NA $0.00 NA NA NA <br />Operator cost/hour : $24.95 NA $32.78 NA NA NA <br />Unit subtotals : $204.60 NA $157.70 NA NA NA <br />Number of units : 2 0 1 0 0 0 <br />Group subtotals : Work : $409.20 Support : $157.70 Maintenance : $0.00 <br />Total work team cosUhour : $566.90 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 23,068 CCY factor: 1.125 <br />volume : 25,952 LCY <br />Source of quantity take-off :Reclamation Plan <br />Source of estimated swell factor :Earth <br />
The URL can be used to link to this page
Your browser does not support the video tag.