My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE106455
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE106455
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:59:10 PM
Creation date
11/24/2007 1:48:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005080
IBM Index Class Name
Permit File
Doc Date
8/27/2007
Doc Name
Cost Summary form
From
Allen Drilling and Excavating Co., Inc.
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />WHEEL LOADER -LOAD AND CARRY WORK <br />PROJECT IDENTIFICATION <br />Task#: 003 State: Co/orado Pertnigjob #:M-2005-080 <br />Abbreviation :none _ _ <br />Filename : M080-003 <br />Date : 09/29/2006 <br />User: KAP <br />CounTy:Park <br />Site :Allen Pit <br />Agency or organization name : Coloratlc Division O/Reclamation Mining And Safety <br />Permit or otherjob action :Surety Reduction <br />Task description :Transport of overburden and topsoil for grading <br />HOURLV~EQUIPMENT COST Basic machine :CAT962G (2003) ~HOrsepowec 200 <br />Attachment no. 7 : ROPS Cab Shift basis : 1 per day <br />Data source : (CRG) <br />Utilization 1 <br />Cost Breakdown : Ownership wsVhour : $27.66 NA <br />Operating cosUhour: $37.92 100 <br />Operator cosUhour: $32.78 NA <br />Total unit cosUhour: $86.36 Total Fleet wst/hour : $86.38 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume' 23,068 CCY factor: 1.275 volume: 28,028 LCY <br />Source of quantity takeoff :Reclamation Plan <br />Source of estimated swell factor :Top Soil <br />HOURLY PRODUCTION (Cat HB) <br />Loader Cvcle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.550 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material: Materia/1/8"to 3/4"diameter -0.020 (Cat HB) <br />Slockpile: Conveyor or dozer piled lO H. high and up 0.000 (Cat HB) <br />Truck ownership : Independen8y owned trucks 0.040 (Cat HB) <br />Operalion: Constant operation -0.040 (Ca[HB) <br />Dumptarget: No adjustment-factor not app/icable 0.000 (Cat HB) <br />Net cycle time adjustment : -0.020 minutes <br />Adjusted basic cycle time : 0.530 minutes <br />Rollins Resistance - Roatl Conditions <br />Haul :Rutted dirt, little maintenance, no water, 2" fire penefraG'on <br />Return :Rutted dirt, little maintenance, no water, 2"fire penetration <br />Haul and Return Time Length <br />(Feel) Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />(%) Travel time <br />(minutes) Data <br />Source <br />Haul route: 775 10.00 5.00 75.00 0.3483 (Cat HB) <br />Return route : 775 -10.00 5.00 -5.00 0.1954 (Cat HB) <br /> Total travel time: 0.5437 minutes <br />Loader Bucket CaDaciN Total cycle time : 1.074 minutes <br />Rated capacity: 4.00 LCY (heaped) (Cat HB) <br />Bucket fill factor: 0.975 Loose material -mixed moist aggregates (95-700%) <br />Adjustetl capacity: 3.90 LCY <br /> Source <br />Job Condition Correction Factors Altitude adjustment factor: 7.00 _(Cat HB) <br />Site altitude : 9,660 feet Job efficiency factor: 0.83 (1 shik/day) <br /> Net correction : 0.83 multiplier <br />Unadjusted hourly unit production : 27794 LCYMr <br />Adjusted hourly unit production : 78089 LCY/Hr (Cat HB) <br />Adjusted hourly Fleet production : 180.89 LCY/Hr <br />JOB TIME AND COST <br />Fleet size: 7 Loader(s) Total job time: 154.94 Hours <br />Unit cost: $0.477 /LCY Total job cost: $13,381 <br />
The URL can be used to link to this page
Your browser does not support the video tag.