Laserfiche WebLink
• • <br /> D. LOADING OUT FROM RAW MATERIAL STOCKPILE: <br /> Method of loading out (frpnt-end loader, conveyor, etc. ) <br /> r <br /> Loading schedule: <:r) tons/hour _ hours/day days/year <br /> Proposed controls for loading to stockpile: <br /> Controls include: no control, water sprays, total exposure, partial <br /> exposure, moist material, other (specify) ? 7" <br /> VI. PROCESSING <br /> Will processing (i.e. , crushing, screening, etc. ) occur on site? <br /> Yes ❑ No (check one) <br /> NOTE: ALL PROCESS EQUIPMENT REQUIRES A SEPARATE PERMIT APPLICATION AND <br /> APEN (SEPARATE FORM IS ATTACHED AT END OF THS FORM - MAKE ADDITIONAL <br /> COPIES AS NEEDED) . <br /> Material loaded into processing equipment by* <br /> Conveyor Front end loader Other <br /> CONTROLS FOR PROCESSING INCLUDE: Moist or wet materials (specify <br /> moisture % if known) , water spray bars, bag filters, other <br /> (specify) , no control. If existing processing equipment will be <br /> relocated from another location complete the following sections. <br /> This equipment must already be permitted. <br /> (LIST PROCESSING CONTROLS IN THE APPROPRIATE SPACES BELOW) <br /> A. PRIMARY CRUSHING <br /> Maximum tons crushed per year +tom tons. <br /> Maximum tons crushed per hour tons. <br /> Hours of crushing per day _ hours. <br /> Proposed controls (see above) <br /> B. SCREENING/CLASSIFYING <br /> Maximum tons screened per year C) c' tons. <br /> Maximum tons screened per hour tons. <br /> Hours of screening per day hours. <br /> Proposed controls (see above) <br /> C. SECONDARY CRUSHING <br /> Maximum tons crushed per year tons. <br /> Maximum tons crushed per hour i tons. <br /> Hours of crushing per day hours. <br /> Proposed controls (see above) <br /> 5 <br />