My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-05-24_PERMIT FILE - M1994081
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1994081
>
1993-05-24_PERMIT FILE - M1994081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2021 3:32:17 PM
Creation date
11/24/2007 1:37:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994081
IBM Index Class Name
Permit File
Doc Date
5/24/1993
From
DEPT OF THE ARMY ALB DISTRICT
To
RON BARRIER
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> D. LOADING OUT FROM RAW MATERIAL STOCKPILE: <br /> Method of loading out (frpnt-end loader, conveyor, etc. ) <br /> r <br /> Loading schedule: <:r) tons/hour _ hours/day days/year <br /> Proposed controls for loading to stockpile: <br /> Controls include: no control, water sprays, total exposure, partial <br /> exposure, moist material, other (specify) ? 7" <br /> VI. PROCESSING <br /> Will processing (i.e. , crushing, screening, etc. ) occur on site? <br /> Yes ❑ No (check one) <br /> NOTE: ALL PROCESS EQUIPMENT REQUIRES A SEPARATE PERMIT APPLICATION AND <br /> APEN (SEPARATE FORM IS ATTACHED AT END OF THS FORM - MAKE ADDITIONAL <br /> COPIES AS NEEDED) . <br /> Material loaded into processing equipment by* <br /> Conveyor Front end loader Other <br /> CONTROLS FOR PROCESSING INCLUDE: Moist or wet materials (specify <br /> moisture % if known) , water spray bars, bag filters, other <br /> (specify) , no control. If existing processing equipment will be <br /> relocated from another location complete the following sections. <br /> This equipment must already be permitted. <br /> (LIST PROCESSING CONTROLS IN THE APPROPRIATE SPACES BELOW) <br /> A. PRIMARY CRUSHING <br /> Maximum tons crushed per year +tom tons. <br /> Maximum tons crushed per hour tons. <br /> Hours of crushing per day _ hours. <br /> Proposed controls (see above) <br /> B. SCREENING/CLASSIFYING <br /> Maximum tons screened per year C) c' tons. <br /> Maximum tons screened per hour tons. <br /> Hours of screening per day hours. <br /> Proposed controls (see above) <br /> C. SECONDARY CRUSHING <br /> Maximum tons crushed per year tons. <br /> Maximum tons crushed per hour i tons. <br /> Hours of crushing per day hours. <br /> Proposed controls (see above) <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.