Laserfiche WebLink
V. RAN MATERIAL <br /> A. REMOVAL <br /> OTHER <br /> MATERIAL ROCK COAL <br /> Tons removed per year 14 <br /> Maximum tons removed per day oB ,> <br /> Equipment used for removal <br /> Equipment capacity ( in tons) <br /> Est. hours per year required for removal 7 <br /> Is material dry, moist, or wet? <br /> Specify moisture content if known ($) <br /> S. LOADING IN TO RAW MATERIAL STOCKPILE <br /> Method oL loading in (truck bottom dump, front-end loader, etc. ) <br /> Loading schedule: :-n tons/hour j hours/day 1[,f) days/year <br /> Proposed controls for loading to stockpile: fir,.% C 4 <br /> Controls include: no control, water sprays, total enclosure, partial <br /> enclosure, chemical suppressants, reduced drop height, telescoping <br /> chute, other (specify) <br /> C. RAW MATERIAL STOCKPILE <br /> OTHER <br /> MATERIAL ROCK COAL <br /> Maximum tons stored at any one time <br /> Length of time pile remains undisturbed <br /> Proposed controls for raw material stockpile: (check appropriate boxes) <br /> ❑ Watering times/day, or continuous sprinkler (to <br /> maintain moist surface) . <br /> ❑ Chemical stabilizer (Type: ) . <br /> ❑ Compacting of piles, method <br /> ❑ Enclosures: complete, or partial (check one) <br /> ❑ Other (specify) <br /> ® No control <br /> 4 <br />