Laserfiche WebLink
Reclamation (2024 - 2025) <br />Gravel processing and storage area. <br />Reclaim access road. <br />Totally Re-vegetate. <br />Totally reclaimed <br />Reclaim access road. Re-vegetate. <br />Idle except for access road to mining, processing and stockpile areas. <br />Distribute topsoil from Block 19. <br />Start re-vegetation. <br />Gravel extraction. Fait 2024 -Distribute topsoil to Block 18. <br />Fall 2025 -Start re-vegetation. <br />Gravel extraction. <br />Fall 2025 -Distribute topsoil to Block 19. <br />Remove topsoil to Block 17. <br />Fall 2025 -Start re-vegetation. <br />Unaffected. <br />Phase 11 Reclamation (2026 - 2027) <br />Block 1 Gravel processing and storage area. <br />Block 2 <br />thru <br />Block 16 Totally reclaimed. <br />Block 17 Re-vegetated except for access road to mining, processing and stockpile areas. <br />Block 18 Re-vegetated except for access road to Block 19 and 20. <br />Block 19 Retum topsoil to Block 20, reclaim access road and totally re-vegetate. <br />Block 20 DisUibute topsoil, and totally re-vegetate. <br />Block 21 Summer 2026 -Gravel extraction. <br />Fall -Distribute topsoil to berms. <br />Block 22 Fall 2026 -Remove topsoil to Block 21. Gravel extraction <br />Fall 2027 -Return and distribute topsoil from berms on Block 21 <br />Start total re-vegetation. <br />6 <br />