Laserfiche WebLink
Phase 8 Reclamation (2020-2021) <br />Block 1 Re-vegetated except for road access to mining, processing and stockpile areas. <br />thti <br />Block 7 <br />Block 8 Gravel processing and stockpile areas. <br />Block 9 Re-vegetated except for road access to mining, processing and stockpile areas. <br />and <br />Block 10 <br />Block 11 Fatl 2020 - Re-vegetation of topsoil from Block 12 and 13. <br />and <br />Block 12 <br />Block 13 Redistribute topsoil for final reclamation to Block 14. <br /> Fall 2020 - Re-vegetate. <br />Block 14 Gravel extraction. <br /> Fall 2020 - Retum topsoil to mined-out areas. <br /> Re-vegetate. <br />Block 15 Summer 2020 -Remove topsoil to berms on Biock 8. <br /> Gravel extraction. <br /> Fall 2021 -Start re-vegetation of topsoil from Blockl6. <br />81ock 16 Summer 2021 -Remove topsoil and distribute to 81ock 15. <br /> Gravel extraction. <br /> Fall 2021 - Retum topsoil from berms in Block 8. <br />Block 17 Unaffected. <br />thN <br />Block 22 <br />Phase 9 Reclamation 12022 - 2023) <br />Block 1 Summer 2022 -Reopen gravel and processing area. <br />Block 2 Re-vegetated except for access road to Blocks 8 thru 16. <br />thN <br />Block 7 <br />Block 8 Summer 2022 -Distribute topsoil from berm storage to Block 16. <br /> Fall 2022 -Start re-vegetation. <br />Block 9 Fall 2022 -Reclaim the access roads. <br />thru Re-vegetate. <br />Block 14 <br />Block 15 Re-vegetated except for access road to Block 16. <br />Block 16 Fall 2023 -Shape and distribute topsoil from Berms in Block 8. <br /> Re-vegetate. <br />Block 17 Gravel extraction. <br />Block 18 Remove topsoil to berms on Block 17. <br /> Gravel extraction. <br />Block 19 Unaffected. <br />thti <br />Block 22 <br />5 <br />