Laserfiche WebLink
<br />1 <br /> <br /> <br />1_J <br />1 <br />lJ <br /> <br />1 <br />1 <br /> <br /> <br />MIPING PLAP SYHIBIT D (cont.) <br />part of the stage on the existing bench and will then proceed to <br />the south towards the railroad and then east across the entire <br />width of the stage. As mining moves east across the property the <br />bench elevation will gradually change from 6460 to 6470 please <br />refer to the Reclamation Plan Map, Map Exhibit F, for the approximate <br />final shape of the bench. Again any available soils will be stockpiled <br />in perimeter areas. <br />When mining is complete in Stage 2 it will begin on the East end <br />of Stage 3 and move west leaving 2h to lv slopes along the south <br />fence line and removing the temporary slopes created while mining <br />stages 1 and 2. <br />There has been no runoff in the ephemeral drainage for a number <br />of years. BBB Excavating plans to daylight out this drainage. When <br />they do this they will provide for continued drainage across the <br />property by creating a better defined ephemeral drainage course <br />that will run down the 2h to lv slope and across the bench area to <br />the river. See biap Exhibit F for the location and final shape of <br />this ephemeral drainage. This drainage will remain unobstructed <br />during the life of the operation. <br />After stripping available soil, if any, front end loaders <br />will remove the sand and gravel and transport it to the processing <br />crusher. Equipment to be used for various operations may include, <br />but is not limited to bulldozers, dragline, scrapers, front end <br />loaders, haul trucks and water truck for dust suppression. The <br />asphalt and concrete batch plants will be permanently located on <br />Stage 2 until the operation is complete. The 13.00 acres t shown <br />as SHOP AREA on Map Exhibit D-1 is where the asphalt and concrete <br />batch plants, fuel storage areas and other supporting buildings <br />will be located. <br />During mining along the south, west and east property lines a <br />setback of 30 feet will be maintained between the property line <br />and the excavation line. Excavation along the south, west and <br />8 <br />