Laserfiche WebLink
• -5 <br />Stipulation No. 06 <br />PRIOR i0 DIVERTING THE UNCOMPAHGRE RIVER THROUGH THE PHASE I AREA. <br />CONSTRUCT A FLOOD CONTROL BERM ALONG THE SOUTH AND WEST SIDES OF THE <br />PHASE I AREA THAT WILL PROVIDE THE SAME LEVEL OF FLOOD PROTECTION THAT <br />IS PROVIDED BY THE EXISTING BERM. PROVIDE SPECIFICATIONS FOR THE NEW <br />BERM TO THE DIVISION 30 DAYS PRIOR TO CONSTRUCTION. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />MICHAEL B. LONG <br />Division Director <br />5381G <br />