Laserfiche WebLink
. ~ ~ 4- <br />RIDER TO MINING PERMIT <br />Permit Date: August 27, 1993 <br />Permit No: M-91-146 <br />• <br />The following additional stipulations and conditions form an integral part of <br />the foregoing permit: <br />~~'"'``~~``~ Stipu No. Ol <br />br TR- <br />COMPLETE INSTALLATION OF THE EROSION CONTROL STRUCTURE PRIOR TO <br />~ DIVERTING THE UNCOMPAHGRE RIVER THROUGH THE PHASE I MINE AREA. <br />Stipulation No. 02 <br />SUBMIT A LONGITUDINAL CROSS SECTION OF THE PHASE I AND PHASE II PIT <br />AREAS SHOWING THE EXPECTED PROFILES DURING FINAL RECLAMATION. THE <br />PHASE II ARE PROFILE SHOULD BE THE PROFILE AOF THE RIVER BED UPON <br />RECLAMATION. <br />Stipulation No. 03 <br />SUBMIT MONITORING WELL DESIGNS FOR THE THREE EXISTING MONITORING <br />WELLS. MONITOR THE WELLS MONTHLY MEASURING DEPTH TO THE WATER TABLE IF <br />PRESENT. CEASE MINING AND NOTIFY THE MLRD IMMEDIATELY IF THE WATER <br />TABLE IS FOUND TO BE WITHIN TWO FEET VERTICAL DISTANCE OF THE BOTTOM OF <br />THE EXCAVATION. SUBMIT THE MONTHLY WATER TABLE MEASUREMENTS WITH THE <br />ANNUAL REPORT. <br />Stipulation No. 04 <br />CONDUCT A STREAM CHANNEL SURVEY PRIOR TO MINING, ANNUALLY AT THE END OF <br />EACH MINING SEASON, AND DURING FINAL RECLAMATION TO VERIFY THAT THE <br />DEPTH OF EXCAVATION IS LESS THAN OR EQUAL TO TEN (10) FEET. SUBMIT TO <br />THE DIVISION THE SURVEY RESULTS WITHIN 30 DAYS OF OBTAINING THEM. <br />Stipulation No. OS <br />PRIOR TO MINING THE PHASE II AREA, SUBMIT TO THE DIVISION ENGINEERING <br />DESIGNS FOR INSTALLATION OF THE TWO (2) 48" CULVERTS AND A DISCUSSION <br />OF THEIR ABILITY TO HANDLE THE FLOWS OF THE UNCOMPAHGRE RIVER. <br />~ S~ft <C(SC' ccu~Ci r~~~ I n~ ~~- 1 <br />