Laserfiche WebLink
<br />t~µ44~T ~ ~~ <br />RECLAMATION PLAN <br /> <br />We, Horn Ranches Inc. intend to start operation by first <br />removing top soil from aproximate one-third of area. This will <br />be done with a dozer or loader or both. As soil in this area <br />is very shallow two inches to four inches care will be taken in <br />removal to save as much as possible to cover area as it is <br />mined out. This top soil will be stock piled and seeded with <br />Rye grass if necessary, to prevent blowing. <br />As the gravel is removed a three to one slope will be main- <br />tained. As soon as possible after area is mined out top soil <br />will be spread with truck and loader. Barnyard manure will be <br />applied at the rate of two ton per acre. This will be disked <br />in the top soil. Then area will be seeded with Bromegrass and <br />Crested-wheat. Varieties and rate of seeding as recolmende.d by <br />Soil Conservation. <br />