Laserfiche WebLink
Jeh~ i7, 7007 <br />ills Daniel /ternnnde- <br />Re: Coiv Comp Protect, A'OI.Y-2007-329-On, Responses to Adeyuacy Conwients <br />Page 3 <br />"Vehicular lrm+el on other than established graded and s'uafnce roads will be ]smiled to that <br />ahsolulely necessary to conduct the exploration. Trai~el wiA be confined m graded and <br />smfuced roads daring periods irhen excessii~e damage to regetation or rz~~ling of the Innd <br />sruface could result. <br />Response: The requested statement has been added to die NOI Supplemental Information on page 6 <br />under the section Site Development -Exploration Access. <br />6. ht accordance with the requirements of Regulairons 2.02.2(s)~) and d.?L~(.i), please nrodfy <br />the text of the NO! to include dre fallowing statement: <br />"Prior to earllr-proving ar excavation of any type, the A and 6 horrzoars wrll be salvaged and <br />rmred in on rmen dial will he undisturbed and not subject to excessive wind or wales erosion. <br />77ie under]}-ing subsoil mulerials udll, if necessary, be sah+uged and s'lored in an area se/~ara(e <br />from .~I and 6 horizon nmlerials. bnmediately aeon cessation of operations, the subsoil i~~ill be <br />replaced, wish the surface left in a roughened condition. Z'he A and 6 horiaons wi/l then be <br />replaced oi~er the st~bsorl material. " <br />Response: The requested statement has been added to the NOI Supplemental Information on page 6 <br />under die section Site Development -Drill Pad Construction. CCR is committed to reclaiming the <br />exploration disturbances in as timely a manner as possible; however, equipment scheduling <br />limitations or weather-related delays may result in a several day(s) gap between cessation of <br />operations and drill pad reclamation. <br />7. In accordance with the requtrenrents ofRegzdalions Z.OZ1(2)(/) and =111(-1), please modify the <br />~e.~~~ of ahe iVOI lu include the jolloiving statenrenl: <br />°ExcuvaNons, artrfrcicr! flat areas, crud embankments creuled diming esplarutron will be <br />remm~ed to aherr approzhiaate orTgincrl contour promptly cfler such feaha~es are no longer <br />needed fbr coal exploration. " <br />Response: The statement has been added to the NOI Supplemental Information on page 1 I under <br />the section Exploration Site Reclamation. <br />8. :Is mentioned previously in this letter, she Division has calculated cr sec/amnlian bond estimate <br />fur this NOT. This cost es~imo~e reflects certain [eleplrone conrerscuruns held recently behi~een <br />[he Division and representalires of Colorado Coal Resources. LLC. Per these conversations, <br />Colorado Coal Resources LLC has stated that, calirary Io language in the NOl, rt does not <br />intend ro [win any of the prrnnrry ll exploration drill holes (CCU-001 through CCU-01 /) <br />without first si~bndlled to die Divrsion for approval an amendment io the NOI to conduct the <br />hvinning. The cos! es'limate for the NOI reflects this intent, rnid therefore does noC contain <br />reclamation cos7s for nvrnned holes'. In accordance udth the ter/uirements of Regttlatians' <br />2.OZ.2(Z)(g) and 3.05.?, please Therefore revise the NOI ~o mdreute that Colorado Coal <br />Ilydro-Environmentril Solutions, Inc. <br />N.O. Box 172996 <br />57 /0'~ S4~eel, Sui(e B <br />Stc¢mbant SprinPa CO 80077 <br />970-87[-6[35 "970-87[-6196 (fax/ <br />