My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE105666
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE105666
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:34 PM
Creation date
11/24/2007 12:40:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005033
IBM Index Class Name
Permit File
Doc Date
9/13/2006
Doc Name
Financial and Performance Warranty Request - Constr. Material Op
From
DRMS esc
To
Coulson Excavating Company Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost EsUmatina Software <br />Date : 09H2/2006 <br />User : ESC <br />County :Larimer <br />Site :GeNels PH <br />Abbreviatlon :none <br />Filename : M033-003 <br />Agency or organization name :DBMS <br />Permit or other job action :M-2005-033 <br />Task descdption :Rip Shale from D-Plt Floor to Construct Pond L/ner <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D10R - fO5U (2005) Horsepower : 570 <br />Blade type :Sem!-Universal <br />Attachment no. 1 :BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 :>-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Coat Breakdown : Ownership cost/twur : $100.88 NA <br />Dozeropera0ng cosUhour; $132.31 100 <br />Ripper operating cosUhour ; $11.88 100 <br />Operatorcost/hour : $32.78 NA <br />Total unit cost/hour : $27762 Total fleet cosUhour : $555.23 <br />Selected estlmatlng method : Area <br />Alternate methods - <br />Selsmic : NA NA <br />Area : 11.00 acres <br />Load factor : NA <br />RIp depth (ft) : 200 <br />Bank volume : NA BCY <br />Volume : 35,493 BCY ar CCY <br />Source of es8mated quantlry :Operator Estimate <br />Source of estimated load factor : NA <br /> <br />HOURLY PRODUCTION ;. <br />Alternate methods - Job ondition Co action Factors - <br />Salamic : Seismic velocity : NA feeUsecond Unadjusted production <br />Unadjusted production : NA cu. yds.llwur per selected method : 1,830.62 cu. yds.lhour <br /> <br />Area : Avg. ripping depth : 2.00 feeVpass Site al8tude : 5,000 feet <br />Average ripping width : 8.74 feeVpass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 50.00 feet/pass Job efficiency factor : 0.83 (1 shiNday) <br />Average dozer speed : 88.00 feeUminute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.567 acres/hour Adjusted unit production : 1,519.41 cu. yds./hour <br />Unadjusted producticn : 1,830.62 cu. yds./hour Adjusted fleet production : 3,038.82 cu. yds./hour <br />JOB TIME AND CO37 <br />Fleet size : 2 dozers) Total job 8me : 11.88 hours <br />Unit cost : $0. f 83 per cu. yd. Total job cost : $8,485 <br />Task # : 003 State : Cokxado PenniUjab # :11F2005A33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.