My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE105666
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE105666
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:34 PM
Creation date
11/24/2007 12:40:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005033
IBM Index Class Name
Permit File
Doc Date
9/13/2006
Doc Name
Financial and Performance Warranty Request - Constr. Material Op
From
DRMS esc
To
Coulson Excavating Company Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 09H22008 <br />User : ESC <br />Agency or organization name :ORMS <br />Permit or other job actlon :New 112 <br />State :Colorado <br />County:Ladmer <br />Site : Garde/s Pd <br />Task description : Backflll d Grade Cell C to Grade <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :1~hank ripper <br /> Data source : (CRG) <br /> UUlizadon % <br />Cast Breakdown : Ownership cost/ltour: $100.86 NA <br />OpereUng cost/hour : $132.31 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cosNhour : $32.78 NA <br />Total unit cost/hour : $265.95 Total fleet costlhour : $531.90 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 217,000 LCY factor : NA volume : 217,000 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condigon Correction Factors Source <br />Average push distance : 150 feet <br />Unadjusted howdy productlon : 1,243.2 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 0.00 % <br />Average ske altitude : 5,000 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight descdption <br />rock - 25% Rock, 7596 Earth <br />Operator skill : 0.75 (av <br />Material consistency : 1.20 (Cat <br />Dozing method : 1.00 (ge <br />Visibility : 1.00 (ev <br />Job efficiency : 0.83 (1shd <br />Spoil pile : 0.80 (1nc <br />Push gradient : 1.00 (Cat <br />Altitude : 1.00 (Cat <br />Material weight : 0.87 (Cat <br />Blade type : 1.00 (S/Si <br />Net correction : 0.52 <br />Adjusted unit production : 644.58 LCY/hr <br />Adjusted fleet production : 1,289.18 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 2 Dozers) Total job time : 188.33 Hours <br />Unit cost : $0.413 /LCY Total job cost : $89,532 <br />Pennifrob# :IN-2005.033 <br />Abbreviation :none <br />Filename : M033-002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.