My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE105666
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE105666
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:34 PM
Creation date
11/24/2007 12:40:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005033
IBM Index Class Name
Permit File
Doc Date
9/13/2006
Doc Name
Financial and Performance Warranty Request - Constr. Material Op
From
DRMS esc
To
Coulson Excavating Company Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Coat Eatimatina Software <br />Task #: 003 <br />Date : 09H2l2006 <br />User : ESC <br />Agency or organizatlon name :DBMS <br />Permit or other job action :New 112 Applka8on <br />Task description :Baekflll D-Pk Slopes to 3h:1v <br />Basic machine :Cat D10R - 10SU (2005) <br />Blade type : Sem6Unlversal <br />Attachment no. 1 : RODS Cab <br />Attachment no. 2 :1-shank rtpper <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume: 45,000 LCY <br />Source of estimated volume :Op <br />Source of estimated swell factor : NA <br />State :Colorado <br />County : Ladmer <br />Site : Gardels Pit <br />Permitljob# :IN-2003-033 <br />Abbreviation :none <br />Filename : M033-005 <br /> U8lizatlon % <br />Ownership cosf/hour : $100.88 NA <br />Operetlng cost/hour : $132.31 100 <br />Ripper op. cosflhour : $0.00 D <br />Operator cosUhour: $32.78 NA <br />Tofal unit cosUhour : $285.95 Total fleet cost/hour <br />Average push distance : 300 feet <br />Unadjusted hourly production : 633.3 LCY/hr <br />Material consistency descdp8on <br />PartN consolidated stockpile <br />Swell Loose <br />factor: NA volume: 43,000 LCY <br />EsOmate <br />Average push gradient <br />Average site altitude <br />Matedal weight <br />Weight descdption <br />Decomposed rock - 25% Rock, <br />0.00 % (/ <br />5,000 feet <br />2,650 IbslLCY <br />75% Earth <br />Net correctlon : 0.48 <br />$263.95 <br />Source <br />Adjusted unit produc0on : 300.99 LCY/hr <br />Adjusted fleet production : 300.99 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 149.31 Hours <br />Unit cost : $0.884 /LCY Total job cost : 539,781 <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br /> <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Horsepower: 570 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.