My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE105666
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE105666
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:34 PM
Creation date
11/24/2007 12:40:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005033
IBM Index Class Name
Permit File
Doc Date
9/13/2006
Doc Name
Financial and Performance Warranty Request - Constr. Material Op
From
DRMS esc
To
Coulson Excavating Company Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION ~ sheet 2 of 2 <br />Hauling Caoaclly: <br />Basis <br />Scraper Bowl (volume) Basis <br />Material weight : 2,800 pounds/LCY <br />Material descdptlon <br />Clav -Natural bed <br />Rated paybad : 48,000 pounds <br />Payload capacity : 17.14 LCY <br />SWCk volume : 14.00 LGY <br />Heaped volume : 20.00 LCY <br />Average volume : 1700 LCY <br />Adjusted capacity : 17.00 LCY "• <br />hourly production reflects volume per scraper pair on pustr~pull models <br />Cycle Time : ob Condl ton Corrections : Site altitude (ft.) : 5,000 <br /> Scraper Push dozer Source <br />Scraper loading 8me • : 1.50 minutes AlBtude adj.: 1.000 NA (Cat H8) <br />Maneuver and spread time : 0.80 minutes Job efficiency : 0.830 NA (Cat H8) <br />• bad tlrre per scraper pair on push-pun modeb Net COReC80n . 0.830 NA <br />Travel tlme <br />Road conditlon descdp8on : Ru(ted dirt lif8e maintenance, no water, 2"tire penetration <br />Haul Route <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel 8me (min.)" <br />1 500 0.00 5.00 5.00 2218 0.40 <br />2 200 5.00 5.00 10.00 1068 0.01 <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul 8me : 0.11 minutes <br />Retum route <br />1 200 -5.00 5.00 0.00 2921 0.18 <br />2 500 0.00 5.00 5.00 2814 0.18 <br /> <br /> <br /> <br /> <br /> <br /> <br />•• gavel time for each segment is adjusted for aaeleretlonldeceleretlon. Return time : 0.31 minutes <br />table velocities are max. atiaina6le per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 2.88 minutes <br />Unadjusted unk productioNhour : 357.25 LCY/hour •'• Adjusted forjob conditions : 296.52 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 593.03 LCY/hour <br />Adjusted multiple scraper team (fleet) howdy production : 593.03 LCY/hour <br />...................... <br />,. <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total )ob time : 59.86 Hours <br />Unit cost : 51.259 /LCY Total job cost <br />
The URL can be used to link to this page
Your browser does not support the video tag.