My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE105455
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE105455
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:58:25 PM
Creation date
11/24/2007 12:19:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
2/13/2007
Section_Exhibit Name
Exhibit 53 Bond Liability Calculations Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wheel and track loaders -unadjusted basic loader cycle time (load, maneuver, and dumf 0.575 minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material : Mixed material 0.020 (Cat HB) <br />Stockpile : Conveyor or dozer piled f0 R. high and up 0.000 (Cat HB) <br />Truck ownership : Common ownership of trucks and loaders -0.040 (Cat HB) <br />Operation : Constant operation -0.040 (Cat HB) <br />Dump target : Nominal target 0.000 (Cat HB) <br /> Net cycle ume atljustment : -o.udU mmures <br /> Adjusted loader cycle time (total time per loader pass) : 0.515 minutes <br /> Net load time per truck' : 1.030 minutes <br />TrUCk CVCIe TIme' 'bulk oN St loader cycle wmpleted during truck exGlange if adj. loader cycle ti me <exchange time <br />Truck exchange time ": 0.00 minutes........ Adjusted for site altitude : 0.000 minutes <br />Tmck loatl time: 1.030 minutes........ Adjusted for site altitude : 1.120 minutes <br />Truck maneuver and dump time: 0.90 minutes........ Adjusted for site altitude : 0.900 minutes <br />"set at 0 it exchange trcne <adj. loader cycle time ttruGt exchange completed dtxirg 1st Bader GJGa) <br />Truck travel (haul & return) time: Road condition :Firm, smooth, rolling, dirt/It. surtaced, watered, maintained <br />Nnul rnu}a <br />Road <br />segment# Haul distance <br />(feet) Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%) Speed <br />(feeUminute) Travel time' <br />(minutes) <br />1 2,640 3.80 3.00 6.80 1568 1.716 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return ro ute : Haul time "' : 1.716 <br />1 2,640 -3.80 3.00 -0.80 2938 0.944 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />ninutes <br />'lraveltime shown fareach segment inGudes acceleratioNdacelerabonadjustment Return time": 0.944 mlOUtee <br />"total haul and return time shown inclutles altitude adjustment Total truck cycle time : 4.679 minutes <br />Loading tool unit production : 458.21 LCY/hour...... Adjusted for job effciency : 380.32 LCY/hour <br />Truck unit production : 109.64 LCY/hour...... Adjusted for job effciency : 91.00 LCY/hour <br />OptimaV no. truckslloading tool : 4 trucks........... Selected no. truckslloader : 4 trucks <br /> Adjusted hourly truck team production : 364.00 LCY/hr <br /> Adjusted hourly single truck loader team production : 364.00 LCY/hr <br /> Adjusted hourly multiple truck loader team production : 364.00 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 29.41 Hours <br />Unit cost : $2.174 /LCY Total job cost : $23,270 <br />
The URL can be used to link to this page
Your browser does not support the video tag.