TWENTYMILE COAL COMPANY <br />VFD Pump building next to Electric Shop <br />Statement of Work <br />1. Objectives <br />Ta Build an Insulated building next to the electric shop that will house the VFD pump <br />skids that are now necessary to supply the water requirements for the new I.ongwall. The <br />building must be large enough to accommodate two VFD pump skids and drives, and allow <br />for ease of maintenance. Because of the equipment criticality, the second pump would act <br />as a spare. <br />2. Background <br />The existing pumping system that delivers water from the million gallon tank to the <br />underground operations is inadequate, and will not meet the requirements demanded by <br />the Longwall system. It has become necessary to install 150 HP, 480 Volt, variable <br />frequency drives to achieve our goals. <br />3. Requirements <br />3.1 Technical References <br />3.1.1 Refer to the attached drawings for general layout of the building to be <br />constructed. <br />3.1.2 TCC Standard Specifications available on request. <br />3.1.3 The building footprint is to be 20 ft. by 17 ft. to allow for the size of the <br />pump skids. <br />3.1.4 The building should be designed fora 40-psf loading, The existing roof <br />slope is a 12:4. The roof surface for the new structure with 2' eaves and <br />a 12:4 slope is 22' X 24'. The wall should be designed for a minimum <br />300 lb per lineal foot of wall. The foundation should be designed for the <br />above 300 lb per lineal foot plus the weight of the wall and building per <br />lineal foot. <br />3.1.5 The roof of the pump building will have the same slope as the existing <br />structure. <br />3.2 Contractors Tasks <br />3.2.1 All work performed by the contractor must conform to the TCC Standard <br />Specifications. <br />3.2.2 Provide all material, tools and equipment necessary to complete this <br />project. <br />MR06-205 EX49F-1 02/01/06 <br />